General Dry Docking Maintenance Services carried out (included fresh water, cooling water supply, shore power, fire line). Approximately 13.567 tonnes of Steel renewal work carried out on Weather Deck (cropped and renewed steel plate and flat bar), Weather Deck Ramp (cropped and renewed steel plate) and Main Deck (cropped and renewed steel plate) collectively. Hull Treatment to vertical sides, flat bottom and freeboard (full HP washing and LP fresh water rinse). Tailshaft overhaul (erected and dismantled; disconnected 4 propeller blades; removed and refitted rope guards). Replaced approximately 9.3 meters of saltwater pipes in engine room with carbon steel pipes