Major works included electrical repairs: alternators overhaul (1), engine room fan motor overhaul (4), cargo pump motors overhaul (4). Full UHP blast and coating to 8,200m². Mechanical works: Propeller removal and refitting, cosmetic polishing to blades. Tailshaft wear down reading, removed/refitted shaft, skimmed chrome liners and seals assistance. Cargo tank/barrier safety valves (inspected and quoted); cargo pump removal/refitting, cargo condensers #1, 2, and 3 sea water inlet and outlet repaired and reconditioned. Steel repairs to water ballast tank #2 (approx. 3 tons of steel).