Hartmann Dry Cargo Germany ‘Frissia Lisabon’

Hartmann Dry Cargo Germany ‘Frissia Lisabon’ a 25,406 tonnes, 208 meters container ship, entered Dry Dock No. 2 on November 22, 2016 for a 11-day work period.

More Info

Our Task

General dry docking maintenance services included shore power supply, cooling water, ballast water supply and fresh water supply.

Complete hull treatment included HP and UHP  washing to Flat bottom (3630m²), vertical sides (4360m²) and topsides (2400m²). Flat bottom: (1) Touch-up coat to (500m²) and (2) full coats of anti-fouling to (3630m²). Vertical sides: (2) touch up coats to (500m²) and (2) full coats of anti-fouling to (4360m²). Topsides: (2) touch up coats to (500m²) and (1) full coat of anti-fouling to (2400m²).

Main engine cylinder liner unit honing (carried out on 4 cylinder liners).

Scattered steel repairs in ballast water tanks.

Most Recent Entries